SKILL.md
$28
QMS Implementation Workflow
Implement ISO 13485:2016 compliant quality management system from gap analysis through certification.
Workflow: Initial QMS Implementation
- Conduct gap analysis against ISO 13485:2016 requirements
- Document current state vs. required state for each clause
- Prioritize gaps by:
- Regulatory criticality
- Risk to product safety
- Resource requirements
- Develop implementation roadmap with milestones
- Establish Quality Manual per Clause 4.2.2:
- QMS scope with justified exclusions
- Process interactions
- Procedure references
- Create required documented procedures — see [Mandatory Documented Procedures](#quick-reference-mandatory-documented-procedures) for the full list
- Deploy processes with training
- Validation: Gap analysis complete; Quality Manual approved; all required procedures documented and trained
Use the Gap Analysis Matrix template in qms-process-templates.md to document clause-by-clause current state, gaps, priority, and actions.
QMS Structure
Level
Document Type
Example
1
Quality Manual
QM-001
2
Procedures
SOP-02-001
3
Work Instructions
WI-06-012
4
Records
Training records
Document Control Workflow
Establish and maintain document control per ISO 13485 Clause 4.2.3.
Workflow: Document Creation and Approval
- Identify need for new document or revision
- Assign document number per numbering convention:
- Format:
[TYPE]-[AREA]-[SEQUENCE]-[REV]
- Example:
SOP-02-001-01
- Draft document using approved template
- Route for review to subject matter experts
- Collect and address review comments
- Obtain required approvals based on document type
- Update Document Master List
- Validation: Document numbered correctly; all reviewers signed; Master List updated
Document Numbering Convention
Prefix
Document Type
Approval Authority
QM
Quality Manual
Management Rep + CEO
POL
Policy
Department Head + QA
SOP
Procedure
Process Owner + QA
WI
Work Instruction
Supervisor + QA
TF
Template/Form
Process Owner
SPEC
Specification
Engineering + QA
Area Codes
Code
Area
Examples
01
Quality Management
Quality Manual, policy
02
Document Control
This procedure
03
Training
Competency procedures
04
Design
Design control
05
Purchasing
Supplier management
06
Production
Manufacturing
07
Quality Control
Inspection, testing
08
CAPA
Corrective actions
Document Change Control
Change Type
Approval Level
Examples
Administrative
Document Control
Typos, formatting
Minor
Process Owner + QA
Clarifications
Major
Full review cycle
Process changes
Emergency
Expedited + retrospective
Safety issues
Document Review Schedule
Document Type
Review Period
Trigger for Unscheduled Review
Quality Manual
Annual
Organizational change
Procedures
Annual
Audit finding, regulation change
Work Instructions
2 years
Process change
Forms
2 years
User feedback
Internal Audit Workflow
Plan and execute internal audits per ISO 13485 Clause 8.2.4.
Workflow: Annual Audit Program
- Identify processes and areas requiring audit coverage
- Assess risk factors for audit frequency:
- Previous audit findings
- Regulatory changes
- Process changes
- Complaint trends
- Assign qualified auditors (independent of area audited)
- Develop annual audit schedule
- Obtain management approval
- Communicate schedule to process owners
- Track completion and reschedule as needed
- Validation: All processes covered; auditors qualified and independent; schedule approved
Use the Audit Program Template in qms-process-templates.md to schedule audits by clause and quarter across processes such as Document Control (4.2.3/4.2.4), Management Review (5.6), Design Control (7.3), Production (7.5), and CAPA (8.5.2/8.5.3).
Workflow: Individual Audit Execution
- Prepare audit plan with scope, criteria, and schedule
- Notify auditee minimum 1 week prior
- Review procedures and previous audit results
- Prepare audit checklist
- Conduct opening meeting
- Collect evidence through:
- Document review
- Record sampling
- Process observation
- Personnel interviews
- Classify findings:
- Major NC: Absence or breakdown of system
- Minor NC: Single lapse or deviation
- Observation: Risk of future NC
- Conduct closing meeting
- Issue audit report within 5 business days
- Validation: All checklist items addressed; findings supported by evidence; report distributed
Auditor Qualification Requirements
Criterion
Requirement
Training
ISO 13485 awareness + auditor training
Experience
Minimum 1 audit as observer
Independence
Not auditing own work area
Competence
Understanding of audited process
Finding Classification Guide
Classification
Criteria
Response Time
Major NC
System absence, total breakdown, regulatory violation
30 days for CAPA
Minor NC
Single instance, partial compliance
60 days for CAPA
Observation
Potential risk, improvement opportunity
Track in next audit
Process Validation Workflow
Validate special processes per ISO 13485 Clause 7.5.6.
Workflow: Process Validation Protocol
- Identify processes requiring validation:
- Output cannot be verified by inspection
- Deficiencies appear only in use
- Sterilization, welding, sealing, software
- Form validation team with subject matter experts
- Write validation protocol including:
- Process description and parameters
- Equipment and materials
- Acceptance criteria
- Statistical approach
- Execute IQ: verify equipment installed correctly and document specifications
- Execute OQ: test parameter ranges and verify process control
- Execute PQ: run production conditions and verify output meets requirements
- Write validation report with conclusions
- Validation: IQ/OQ/PQ complete; acceptance criteria met; validation report approved
Validation Documentation Requirements
Phase
Content
Evidence
Protocol
Objectives, methods, criteria
Approved protocol
IQ
Equipment verification
Installation records
OQ
Parameter verification
Test results
PQ
Performance verification
Production data
Report
Summary, conclusions
Approval signatures
Revalidation Triggers
Trigger
Action Required
Equipment change
Assess impact, revalidate affected phases
Parameter change
OQ and PQ minimum
Material change
Assess impact, PQ minimum
Process failure
Full revalidation
Periodic
Per validation schedule (typically 3 years)
Special Process Examples
Process
Validation Standard
Critical Parameters
EO Sterilization
ISO 11135
Temperature, humidity, EO concentration, time
Steam Sterilization
ISO 17665
Temperature, pressure, time
Radiation Sterilization
ISO 11137
Dose, dose uniformity
Sealing
Internal
Temperature, pressure, dwell time
Welding
ISO 11607
Heat, pressure, speed
Supplier Qualification Workflow
Evaluate and approve suppliers per ISO 13485 Clause 7.4.
Workflow: New Supplier Qualification
- Identify supplier category:
- Category A: Critical (affects safety/performance)
- Category B: Major (affects quality)
- Category C: Minor (indirect impact)
- Request supplier information:
- Quality certifications
- Product specifications
- Quality history
- Evaluate supplier based on:
- Quality system (ISO certification)
- Technical capability
- Quality history
- Financial stability
- For Category A suppliers:
- Conduct on-site audit
- Require quality agreement
- Calculate qualification score
- Make approval decision:
-
80: Approved
- 60-80: Conditional approval
- <60: Not approved
- Add to Approved Supplier List
- Validation: Evaluation criteria scored; qualification records complete; supplier categorized
Supplier Evaluation Criteria
Criterion
Weight
Scoring
Quality System
30%
ISO 13485=30, ISO 9001=20, Documented=10, None=0
Quality History
25%
Reject rate: <1%=25, 1-3%=15, >3%=0
Delivery
20%
On-time: >95%=20, 90-95%=10, <90%=0
Technical Capability
15%
Exceeds=15, Meets=10, Marginal=5
Financial Stability
10%
Strong=10, Adequate=5, Questionable=0
Supplier Category Requirements
Category
Qualification
Monitoring
Agreement
A - Critical
On-site audit
Annual review
Quality agreement
B - Major
Questionnaire
Semi-annual review
Quality requirements
C - Minor
Assessment
Issue-based
Standard terms
Supplier Performance Metrics
Metric
Target
Calculation
Accept Rate
>98%
(Accepted lots / Total lots) × 100
On-Time Delivery
>95%
(On-time / Total orders) × 100
Response Time
<5 days
Average days to resolve issues
Documentation
100%
(Complete CoCs / Required CoCs) × 100
QMS Process Reference
For detailed requirements and audit questions for each ISO 13485:2016 clause, see iso13485-clause-requirements.md.
Management Review Required Inputs (Clause 5.6.2)
Input
Source
Prepared By
Audit results
Internal and external audits
QA Manager
Customer feedback
Complaints, surveys
Customer Quality
Process performance
Process metrics
Process Owners
Product conformity
Inspection data, NCs
QC Manager
CAPA status
CAPA system
CAPA Officer
Previous actions
Prior review records
QMR
Changes affecting QMS
Regulatory, organizational
RA Manager
Recommendations
All sources
All Managers
Record Retention Requirements
Record Type
Minimum Retention
Regulatory Basis
Device Master Record
Life of device + 2 years
21 CFR 820.181
Device History Record
Life of device + 2 years
21 CFR 820.184
Design History File
Life of device + 2 years
21 CFR 820.30
Complaint Records
Life of device + 2 years
21 CFR 820.198
Training Records
Employment + 3 years
Best practice
Audit Records
7 years
Best practice
CAPA Records
7 years
Best practice
Calibration Records
Equipment life + 2 years
Best practice
Decision Frameworks
Exclusion Justification (Clause 4.2.2)
Clause
Permissible Exclusion
Justification Required
6.4.2
Contamination control
Product not affected by contamination
7.3
Design and development
Organization does not design products
7.5.2
Product cleanliness
No cleanliness requirements
7.5.3
Installation
No installation activities
7.5.4
Servicing
No servicing activities
7.5.5
Sterile products
No sterile products
Nonconformity Disposition Decision Tree
Nonconforming Product Identified
│
▼
Can it be reworked?
│
Yes──┴──No
│ │
▼ ▼
Is rework Can it be used
procedure as is?
available? │
│ Yes──┴──No
Yes─┴─No │ │
│ │ ▼ ▼
▼ ▼ Concession Scrap or
Rework Create approval return to
per SOP rework needed? supplier
procedure │
Yes─┴─No
│ │
▼ ▼
Customer Use as is
approval with MRB
approval
CAPA Initiation Criteria
Source
Automatic CAPA
Evaluate for CAPA
Customer complaint
Safety-related
All others
External audit
Major NC
Minor NC
Internal audit
Major NC
Repeat minor NC
Product NC
Field failure
Trend exceeds threshold
Process deviation
Safety impact
Repeated deviations
Tools and References
Scripts
Tool
Purpose
Usage
Generate audit checklists by clause or process
python qms_audit_checklist.py --help
Audit Checklist Generator Features:
- Generate clause-specific checklists (e.g.,
--clause 7.3)
- Generate process-based checklists (e.g.,
--process design-control)
- Full system audit checklist (
--audit-type system)
- Text or JSON output formats
- Interactive mode for guided selection
References
Document
Content
iso13485-clause-requirements.md
Detailed requirements for each ISO 13485:2016 clause with audit questions
Ready-to-use templates for gap analysis, audit program, document control, CAPA, supplier, training
Quick Reference: Mandatory Documented Procedures
Procedure
Clause
Key Elements
Document Control
4.2.3
Approval, distribution, obsolete control
Record Control
4.2.4
Identification, retention, disposal
Internal Audit
8.2.4
Program, auditor qualification, reporting
NC Product Control
8.3
Identification, segregation, disposition
Corrective Action
8.5.2
Root cause, implementation, verification
Preventive Action
8.5.3
Risk identification, implementation
Related Skills
Skill
Integration Point
Management review, quality policy
CAPA system management
Advanced audit techniques
DHF, DMR, DHR management
ISO 14971 integration